Machinery Relocation Service in Thailand

Moving industrial machinery takes more than a truck. CNC machines, presses, and production lines are heavy, sensitive, and costly to replace.

BidMyAsset handles machinery relocation in Thailand from start to finish, from one machine to a full production line.

We also run Thailand’s industrial machinery marketplace, so if moving doesn’t make sense, we can help you sell or replace the machine instead.

Press machine production line, the type of heavy machinery covered by BidMyAsset's machinery relocation service


What is machinery relocation?

Machinery relocation means moving industrial equipment, from a single CNC machine to a full production line, to a new site safely and with minimal downtime.

It covers more than transport:

  • Checking weight and size
  • Disconnecting utilities
  • Protecting sensitive parts
  • Lifting and hauling
  • Reinstalling and testing

One mistake at any step can mean costly damage or lost production.


Machinery we relocate

CNC Machines

CNC milling machine cutting an aluminum workpiece, the precision equipment category BidMyAsset's machinery relocation service handles

Precision machines that need careful alignment and calibration after the move.

Injection Moulding Machines

Row of injection moulding machines on a factory production floor

Heavy, unevenly weighted units. We use engineered lifting and protect the hydraulics.

Press Machines

Large industrial press brake machine on a factory floor, prepared for heavy equipment handling

Often the heaviest item. We check the floor load at the new site first.

Packaging Machines

Filling machine dispensing product into bottles on a packaging line conveyor

Multi-part lines, moved in sequence and rebuilt in the original order.

Industrial Printers

Industrial offset printing press with paper feeding through precision rollers

Sensitive to shock and vibration, so they are crated and protected in transit.

Other Machinery

Industrial robotic arm integrated into an automated production line station

Other factory equipment? Tell us the type and we’ll scope the move.


Our relocation process

1

Site survey

We check the machine, access routes, and floor load at both sites.

2

Planning

We plan the lifting, route, and schedule, then disconnect and pack the machine.

3

Dismantling

Large machines are taken apart in sections, with every connection labelled.

4

Transport

Loaded with the right crane or forklift and moved on a pre-checked route.

5

Reinstall & test

Reassembled, reconnected, and tested before we hand it back to your team.

Considering selling instead of moving?

If moving costs nearly as much as replacing, it may be time to upgrade. We can value your machine and list it for sale on BidMyAsset while we plan the move.


Areas we cover

We relocate machinery across Bangkok and Thailand’s main industrial estates:

Bangkok and the Samut Prakan industrial belt

Wat Arun temple on the Chao Phraya River in Bangkok, Thailand

Amata City and Amata Nakorn (Chonburi)

Chonburi province, Thailand

Laem Chabang and the Eastern Seaboard

Container port with ship-to-shore cranes loading cargo ships

Ayutthaya and Pathum Thani industrial parks

Wat Chaiwatthanaram temple ruins in Ayutthaya, Thailand at sunset

Rayong and Map Ta Phut industrial estates

Fishing boats and riverside town in Rayong, Thailand

Nationwide on request

Twin royal chedis at Doi Inthanon at sunset, Chiang Mai, Thailand


Why choose BidMyAsset for machinery relocation

One partner, from moving to selling

Need to sell or replace instead of move? We handle that too, on the same platform.

Experience with industrial-grade equipment specifically

We trade CNC, press, injection moulding, packaging, and printing machines every day.

Thailand-wide coverage

Bangkok to the Eastern Seaboard, with routes and sites checked in advance.

Transparent planning before you commit

Written scope, timeline, and cost before the move. No surprise charges.

BidMyAsset vs. a typical machinery moving company

BidMyAsset Typical equipment moving company
Relocation planning & handling Yes Yes
Thailand-wide industrial estate coverage Yes Varies by provider
Asset valuation if you’d rather sell Yes, built into the platform Not offered
Sourcing a replacement machines Yes, via the same marketplace Not offered
Single vendor for move + buy/sell Yes No, a separate vendor is needed

Frequently Asked Questions

What is included in a machinery relocation service?

Site assessment, planning, dismantling, transport, reinstallation, and testing. We scope every step before the move begins.

How much does it cost to relocate industrial machinery in Thailand?

It depends on the machine’s weight and size, the distance, and how much dismantling is needed. We give a written quote after a site assessment.

How long does a machinery relocation take?

A single machine usually takes a few days. A full production line typically takes one to two weeks.

Do you handle CNC or press machine relocation specifically?

Yes. We handle CNC machines, press machines, injection moulding machines, packaging lines, and industrial printers.

What if I decide to sell the machine instead of moving it?

We can value it, list it on the BidMyAsset marketplace, and help you source a replacement, before you pay for a move.

Do you offer equipment moving services outside Bangkok?

Yes. We cover the Eastern Seaboard, Rayong, Ayutthaya, and Pathum Thani industrial estates, and further on request.